33 USC 426h-1: Definitions
Result 1 of 1
   
 
33 USC 426h-1: Definitions Text contains those laws in effect on November 20, 2024
From Title 33-NAVIGATION AND NAVIGABLE WATERSCHAPTER 9-PROTECTION OF NAVIGABLE WATERS AND OF HARBOR AND RIVER IMPROVEMENTS GENERALLYSUBCHAPTER I-IN GENERAL
Jump To: Source Credit

§426h–1. Definitions

In sections 426e and 426f to 426h–1 of this title, the following definitions apply:

(1) Erosion control program

The term "erosion control program" means the national shoreline erosion control development and demonstration program established under this section.

(2) Secretary

The term "Secretary" means the Secretary of the Army.

(3) Separable element

The term "separable element" has the meaning provided by section 2213(f) of this title.

(4) Shore

The term "shore" includes each shoreline of the Atlantic and Pacific Oceans, the Gulf of Mexico, the Great Lakes, and lakes, estuaries, and bays directly connected therewith.

(5) Shore protection project

The term "shore protection project" includes a project for beach nourishment, including the replacement of sand.

(Aug. 13, 1946, ch. 960, §6, as added Pub. L. 104–303, title II, §227(e)(1), Oct. 12, 1996, 110 Stat. 3702 .)